Insights
Notes on work we actually do
Methods, not opinions, written for the maintenance engineer, works manager or owner who has to decide something this week.
All insights
01
Who owns the drawings when you reverse engineer a part?
Engineering · September 2026 · 4 min readTwo questions get muddled here and only one is about the law: what to ask before work starts, and where to stop and take proper advice.
02
Tolerancing a part with no original drawing
Engineering · September 2026 · 4 min readScanning accuracy is the number everyone quotes. Recovering what the part was designed to be is the part that decides whether the replacement works.
03
Documenting obsolete spares before the machine stops
Maintenance · September 2026 · 3 min readFour questions that identify the handful of parts worth drawing now, while the machine is still running.
04
How to tell whether a job made money
Operations · September 2026 · 4 min readA six-step method you can run by hand on twenty jobs in a fortnight, before spending anything on a system.
Ask
Is there something you would want written up?
If there is a question nobody answers properly, tell us; it is where most of these came from.